DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:03.30 16:42

  • NIGERIA | LAGOS:03.30 17:42

  • EGYPT | CAIRO:03.30 18:42

  • UAE | DUBAI:03.30 20:42

  • SRI LANKA | COLOMBO:03.30 22:12

  • SINGAPORE:03.31 00:42

  • ENGLAND | LONDON:03.30 17:42

  • RUSSIA | MOSCOW:03.30 20:42

  • CHINA | BEIJING:03.31 00:42

  • AMERICA | Los Angels:03.30 09:42

  • AMERICA | New York:03.30 12:42

  • BRAZIL | San Paulo:03.30 13:42