DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:01.31 16:36

  • NIGERIA | LAGOS:01.31 17:36

  • EGYPT | CAIRO:01.31 18:36

  • UAE | DUBAI:01.31 20:36

  • SRI LANKA | COLOMBO:01.31 22:06

  • SINGAPORE:02.01 00:36

  • ENGLAND | LONDON:01.31 17:36

  • RUSSIA | MOSCOW:01.31 20:36

  • CHINA | BEIJING:02.01 00:36

  • AMERICA | Los Angels:01.31 09:36

  • AMERICA | New York:01.31 12:36

  • BRAZIL | San Paulo:01.31 13:36