Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:01.31 17:56
NIGERIA | LAGOS:01.31 18:56
EGYPT | CAIRO:01.31 19:56
UAE | DUBAI:01.31 21:56
SRI LANKA | COLOMBO:01.31 23:26
SINGAPORE:02.01 01:56
ENGLAND | LONDON:01.31 18:56
RUSSIA | MOSCOW:01.31 21:56
CHINA | BEIJING:02.01 01:56
AMERICA | Los Angels:01.31 10:56
AMERICA | New York:01.31 13:56
BRAZIL | San Paulo:01.31 14:56