Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:11.05 05:36
NIGERIA | LAGOS:11.05 06:36
EGYPT | CAIRO:11.05 07:36
UAE | DUBAI:11.05 09:36
SRI LANKA | COLOMBO:11.05 11:06
SINGAPORE:11.05 13:36
ENGLAND | LONDON:11.05 06:36
RUSSIA | MOSCOW:11.05 09:36
CHINA | BEIJING:11.05 13:36
AMERICA | Los Angels:11.04 22:36
AMERICA | New York:11.05 01:36
BRAZIL | San Paulo:11.05 02:36