The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:01.31 18:17
NIGERIA | LAGOS:01.31 19:17
EGYPT | CAIRO:01.31 20:17
UAE | DUBAI:01.31 22:17
SRI LANKA | COLOMBO:01.31 23:47
SINGAPORE:02.01 02:17
ENGLAND | LONDON:01.31 19:17
RUSSIA | MOSCOW:01.31 22:17
CHINA | BEIJING:02.01 02:17
AMERICA | Los Angels:01.31 11:17
AMERICA | New York:01.31 14:17
BRAZIL | San Paulo:01.31 15:17